Skip to content
Loyihalarga qaytish
YakunlanganBurg'ulash

Drilling 148 Wells for Oil Drilling Rigs

Uzbekistan (multiple sites)

Umumiy ma'lumot

Drilling of 148 exploration and production wells for the technical needs of oil drilling rigs and construction of water supply systems at the facilities. Scope included construction of temporary access roads, drilling pads, rotational camps, and foundations for drilling rigs and auxiliary equipment.

Ish hajmi

  • 148 exploration and production wells
  • Water supply systems at rig facilities
  • Temporary access roads and drilling pads
  • Rotational camps and rig foundations

Loyiha galereyasi

Ushbu loyiha rasmlari tez orada qo'shiladi.