Skip to content
Projelere dön
TamamlandıSondaj

Drilling 148 Wells for Oil Drilling Rigs

Uzbekistan (multiple sites)

Genel Bakış

Drilling of 148 exploration and production wells for the technical needs of oil drilling rigs and construction of water supply systems at the facilities. Scope included construction of temporary access roads, drilling pads, rotational camps, and foundations for drilling rigs and auxiliary equipment.

İş kapsamı

  • 148 exploration and production wells
  • Water supply systems at rig facilities
  • Temporary access roads and drilling pads
  • Rotational camps and rig foundations

Proje galerisi

Bu projeye ait fotoğraflar yakında eklenecektir.