← К списку проектов
ЗавершёнБурение
Drilling 148 Wells for Oil Drilling Rigs
Uzbekistan (multiple sites)
Описание
Drilling of 148 exploration and production wells for the technical needs of oil drilling rigs and construction of water supply systems at the facilities. Scope included construction of temporary access roads, drilling pads, rotational camps, and foundations for drilling rigs and auxiliary equipment.
Объём работ
- 148 exploration and production wells
- Water supply systems at rig facilities
- Temporary access roads and drilling pads
- Rotational camps and rig foundations
Галерея проекта
Фотографии по этому проекту будут добавлены позже.
